Poor House Run Stream Restoration & Culvert Replacement Project

Denton Announces Schedule for Poor House Run Stream Restoration and

Culvert Replacement

Project to address stormwater flooding and stream erosion at 5th Street and Legion Road

The Town of Denton, in partnership with ShoreRivers, will soon begin a two phased construction project at 5th Street and Legion Road, to address challenges associated with stormwater flooding and the downstream erosion of Poor House Run.

Poor House Run receives stormwater from a large portion of Denton’s developed areas. Over time, the volume and force of that runoff have contributed to streambank erosion and deterioration around existing infrastructure resulting in flooding at 5th Street and other public safety concerns. The coordinated restoration and culvert replacement are intended to improve the stream’s function, strengthen infrastructure, and better manage stormwater while protecting local water quality.

Phase 1: Poor House Run Stream Restoration (Late November through December 2026)

Construction will first focus on the restoration of two badly eroded legs of the Poor House Run stream corridor, just after they pass beneath 5th Street up to where they converge about 625 feet downstream. Equipment mobilization is scheduled to begin the week of Thanksgiving, with construction expected to begin the following week.

What neighbors should expect:

  • No road closures are planned during the stream restoration phase.
  • Residents may see construction equipment moving in the forested area adjacent to where Legion Road intersects with 5th Street.
  • The parking lot at Choptank Community Health will be used to support construction operations.

Construction is expected to continue through the end of the year, depending on weather and site conditions.

 

Phase 2: 5th Street and Legion Road Culvert Replacement (February–March 2027)

The second phase will replace the existing culvert on the 5th Street, on the north/west side of the Legion Road intersection. This work will require significant road closures and traffic detours while crews remove and replace the existing culvert.

The Town and project team will work to minimize the duration and extent of closures wherever possible. Depending on construction requirements and site conditions, the most disruptive scenario could involve a continuous closure lasting approximately four to five weeks. The Town will share additional information about specific closure dates, detour routes, and access arrangements as the schedule is finalized.

Residents and commuters should plan for potential delays and allow additional travel time during this phase.

Poor House Run is a tributary of the Choptank River, and its watershed reflects the connection between a town’s stormwater infrastructure and the health of its local waterways. Stormwater runoff can carry sediment and other pollutants into streams, while concentrated flows can erode streambanks and damage infrastructure, causing public and environmental health concerns.

By pairing stream restoration with culvert replacement, the project takes a coordinated approach to improving local infrastructure and restoring the stream’s natural functions. The work builds on years of planning and collaboration between the Town of Denton and ShoreRivers to identify practical solutions that address local flooding concerns, protect public and private property, and improve water quality. This project was funded completely or in part by the Maryland Whole Watershed Program.

The Town appreciates the patience and cooperation of nearby residents and businesses as this important work moves forward. Additional updates regarding construction progress, road closures, and traffic detours will be shared as they become available.

For project updates or questions, contact: